推广 热搜: 股市  有限公司  企业融资  009  家电  创业  电子商务  公司  服装  服务公司 

PTA Land Force Projection Systems with Improved Performance

   2018-06-15 CN-INFO15390
核心提示: PARIS--(BUSINESS WIRE)--The French Defense Procurement Agency has awarded CNIM a contract for modernization of PTA ground force projection systems (Fast Bridge laying System). This automatic launching system, designed and de...

PARIS--()--The French Defense Procurement Agency has awarded CNIM a contract for modernization of PTA ground force projection systems (Fast Bridge laying System).

This automatic launching system, designed and developed by CNIM, delivered in 2011, in just 10 minutes deploys two MLC 100 bridges, 14 metres long or one MLC 80 long bridge,, 26 metres long, in order to project military tanks*over an obstacle (wet or dry gaps, such as a river or crevasse), the number of operators being limited to two with controls. Each PTA is made up of two vehicles (bridging** and additional semi-trailer bridge carriers), and is designed to drop or recover the bridge elements it transports automatically.

The Army is currently equipped with 10 vehicles incorporating the bridge (or pontoon) launching and recovery systems, with 10 semi-trailers carrying additional bridge elements, and 40 bridge elements. CNIM's mission as part of this modernization contract is to increase the operational performance of the French Army's modular assault bridge over its entire lifespan. In order to facilitate haulage and bridging operations while ensuring optimal detection of external threats, a latest generation optronic vision system, produced by the subsidiary Bertin Technologies, will be integrated. It will offer the pilot and his skipper an all-round vision by day and by night. Thus, a larger number of cameras will observe the immediate SPRAT environment.

The supervisory command and control system for all PTA technical parameters will be modernized with the integration of a new IT architecture, offering a high level of maintainability. The first modified equipment will be delivered to the Army in mid-2019.

www.cnim.com/en

* Leclerc tank type vehicle
** Vehicle incorporating the bridge element launch and recovery system

 

Contacts

PRESS:
Gootenberg PR agency
Laurence Colin, Tel : +33 (0)1 43 59 00 46
laurence.colin@gootenberg.fr
or
Frédérique Vigezzi, Tel : +33 (0)1 43 59 29 84
frederique.vigezzi@gootenberg.fr

 
反对 0举报 0 收藏 0 打赏 0评论 0
 
更多>同类资讯
推荐图文
推荐资讯
点击排行
网站首页  |  关于我们  |  服务条款  |  广告合作  |  付款方式  |  使用协议  |  联系我们  |  网站地图  |  排名推广  |  广告服务  |  网站留言  |  RSS订阅  |  违规举报